HEATERS & FANS
HYDRONIC HEAT SYSTEM-DRYAIR-400K BTU
Click on above thumbnails for alternate view |
|
Daily: $400.00
Weekly: $1,600.00
Additional Information
- 400 CHU FUEL LP or NG
- 400 CHU DG FUEL Diesel, LP or NG
- OUTPUT BTU/H 348,000 Diesel, 354,756 LP, 354,960 NG
- WEIGHT 1370 lbs (621 kG)
- HEAT SQ.FT. 11,000
- THAW SQ.FT. 6,000
- CURE SQ.FT. 14,000
- How many BTU of heat do you need per square foot?
- To determine the number of BTUs per square foot that you need to heat a room, simply multiply the square footage by 20 BTUs per square foot. For example, if a room has 1,000 square feet, you would require 20,000 BTUs to heat it.
- https://www.calculator.net/btu-calculator.html
- Do you have a large heating requirement?
- Please contact us at Rental Network, Squamish, and we will help you find a solution.
- 2100-0400 Central Heating Unit
- With 350,000 BTU s the 400CHU has the power to heat small to medium sized structures, thaw over 6,000
- square feet of frozen ground or cure concrete slabs up to 14,000 square feet.
- The compact size and bi-directional fork pockets make the 400CHU easy to place on even the smallest job sites.
- System operation is controlled and monitored from the central heating module control panel.
- 7 LED lights indicate operation of all essential systems for easy monitoring and troubleshooting.
- Fluid circulation system is low pressure and atmospherically vented. There is no chance of an explosion or line burst due to pressure build-up. No special boiler certification is required to operate unit.
- A rapid air elimination feature ensures quick setup and-go operation.
- Modular design allows the unit to conform to most special
- job requirements.
- Combine the 400CHU with DRYAIR accessories for specialty heating projects, including:
- D-CAN 30 Desiccant Dehumidifier: Dry out flooded structures, or control humidity in buildings
- under construction to speed drying time of paint, mortar, specialty coatings, or drywall compound.
- Plate Exchanger: Temporarily tie in to boiler systems while the permanent water heater is being replaced or down for maintenance.
- HE250EX Explosion Proof Exchanger: 250,000 BTU s of explosion proof space heating for oil &
- gas sites or industrial/mining applications where there is a risk of combustion from airborne gases
- or particles in the space.
- Hose Reel & Thawing/Curing Hose: Wrap pipelines or fluid vessels to provide freeze protection.
Prices are subject to change. Delivery and other fees are not included in price estimates.
* Please call us with any questions about our hydronic heat system dryair 400k btu rentals in Squamish BC, Vancouver BC, Whistler BC, Pemberton BC and surrounding areas.